Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Hengshui Guangjun Rubber & Plastic Products Co

Bridge bearings, bridge expansion joints, water stops, water stops, sealant, ...

sell
  • There is no classification
contact
  • Contact:肖秀竹
  • Phone:0318-6662886
  • fax:0318-2103688
search
 
link
  • There is no link yet
home > sell > When choosing the sand bucket type temporary bearing in Guyuan City, Ningxia, look for Hengshui Guangjun Rubber & Plastic
When choosing the sand bucket type temporary bearing in Guyuan City, Ningxia, look for Hengshui Guangjun Rubber & Plastic
products: Views:12When choosing the sand bucket type temporary bearing in Guyuan City, Ningxia, look for Hengshui Guangjun Rubber & Plastic 
brand: 广骏
型号: 沙桶式临时支座
规格: 铸钢
厂家: 广骏
price: 80.00元/套
MOQ: 5 套
Total supply: 10000 套
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2015-07-21 15:35
 
Details
When choosing a sand bucket-type temporary support, Hengshui Guangjun Rubber and Plastic Sand Cylinder is made of a thick steel pipe with an inner diameter of 300 and a height of 100 cm, and a thick lower backing plate, which is welded to a steel plate with a diameter of 100 mm at the bottom of the steel pipe to stabilize and seal the bottom opening. Effect. Set a screw port around the steel pipe sand tube at the bottom of the pad, and then screw on the screw. The diameter of the screw is 0.5 Å, which is the switch when the sand flows out. The diameter of the cushion block is slightly smaller than the diameter of the round pipe sandbox. It is made of diameter, thick seamless steel pipe. The cushion plate under the cushion block is thick and the cushion block is high. After processing, concrete is poured into the steel pipe and it can be used after reaching the strength. Placing a pad on the pad can stabilize the beam and adjust the elevation
Sandbox-type temporary support
The sandbox used can be cylindrical or square box-shaped. Because the cylindrical shape is easy to manufacture, just use steel pipes of appropriate diameter and cut them into appropriate lengths. Just weld a seal on one end, so steel pipe sandboxes are usually chosen. When choosing a sand bucket type temporary bearing, look for Hengshui Guangjun Rubber & Plastic
Among them, the lower backing plate is made of steel plate and tightly welded to the bottom of the steel pipe to stabilize and seal the bottom opening. The screws on the side of the steel pipe sandbox are the thread openings on the side of the sandbox, and then the screws are screwed on. It is the switch when the sand flows out. The diameter of the pad is slightly smaller than the diameter of the round pipe sandbox and can be made of anchor rings or iron ring concrete blocks. The upper pad placed on the pad only has the effect of stabilizing the girder. Contact Xiao Xiu
Mobile telephone network
Jiangxi Province
Fuzhou City, Ganzhou City, Ji'an City, Jingdezhen City, Jiujiang City, Nanchang City, Pingxiang City, Shangrao City, Xinyu City, Yichun City, Yingtan City
Liaoning Province< br/>Anshan City, Benxi City, Chaoyang City, Dalian City, Dandong City, Fushun City, Fuxin City, Huludao City, Jinzhou City, Liaoyang City, Panjin City, Shenyang City, Tieling City, Yingkou City
Inner Mongolia Autonomous Region
Alxa League, Bayannur City, Baotou City Chifeng City Ordos City Hohhot City Hulunbuir City Tongliao City Wuhai City Ulanqab City Xilingol League Xing'an League
Ningxia Hui Autonomous Region
Guyuan City Shizuishan City Wuzhong City Yinchuan City Zhongwei City
Shandong Province
Binzhou City, Dezhou City, Dongying City, Heze City, Jinan City, Jining City, Laiwu City, Liaocheng City, Linyi City, Qingdao City, Rizhao City, Tai'an City, Weihai City, Weifang City, Yantai City, Zaozhuang City, Zibo City
Picture deputy
Temporary support Block
Picture subtitle
On the day of March, at the construction site of Zhengda Overseas Chinese Merchants Project of China Construction Third Engineering Bureau, project employee Xiao Zhang and his girlfriend Xiao Zhao completed a simple and warm wedding. Many employees of the project were responsible for their witness. Because Xiao Zhang works on the front line of the construction site all year round and is busy with work, the wedding date has been postponed again and again. The project colleagues discussed holding a simple construction site wedding for Xiao Zhang at the project site to fulfill the couple's wish.
Request for quotation
A total of0articles  Related Comments: